| Date |
| Threads in Forum |
Select Section:
|
|
 |
| 27/04/2008 |
|
We need information regarding
durability of m30 self compacting concrete with normal concrete - rama krishna prasad -
|
View (Replies-0) |
Post reply |
| 08/05/2008 |
|
For constructing a Marine structure comprising of Piles, Diaphragm walls etc, what kind of cement is advisable ?(OPC, PPC, PSC) and why so?. It would be appreciated to comment on this with some previous proven record of the usage of the same in some other relevent structures. - Nerlin Samel George -
|
View (Replies-0) |
Post reply |
| 20/05/2008 |
|
sir , i had a question ,
after 20 hour ,why the M35 concrete are not set.
{the logshit of RMC is OK.}
the material is used of good quality.
it is because of:-
1)addmixture used to improve the strengh.
2)shuttering oil (Dr. fix it) .
3)excess flyash.
or any other reason.......
plz reply
rahul_dh26@rediffmail.com - rahul -
|
View (Replies-1) |
Post reply |
| 24/05/2008 |
|
Are there any additives incorporated during production of ready mix concrete to minimize the curing time period - hadi hussain -
|
View (Replies-1) |
Post reply |
| 31/05/2008 |
|
What makes the ready mix concrete less inexpensive than the conventional concrete?. - hadihussain -
|
View (Replies-1) |
Post reply |
| 04/07/2008 |
|
where can we test chloride diffusion coeffient of concrete.? - Surendra Sharma -
|
View (Replies-0) |
Post reply |
| 21/11/2008 |
|
how RMC have more strength than concrete made at site.
give detail explanation about this. - santosh .s. parwani -
|
View (Replies-1) |
Post reply |
| 22/12/2008 |
|
what is the procedure of pumping concrete to height of 30 storey building - Ashish Jain -
|
View (Replies-1) |
Post reply |
| 10/09/2009 |
|
can we select option of chemical curing in stead of natural curung? - kalpesh -
|
View (Replies-1) |
Post reply |
| 18/11/2009 |
|
Sir, we did a roof concrete during the finishing stage rain poured in what will be the consequences do i need to do any treatment - srinivasan -
|
View (Replies-0) |
Post reply |
| 05/02/2010 |
|
sir, what is maximum retardation available in your product? we want to use M25,M30 & M35 grade of concrtet for our work. we want to know maximum period available for placing concrete. - ninad vora -
|
View (Replies-1) |
Post reply |
| 16/02/2010 |
|
My contractor is using RMC in all his Projects. but during slab casting always he maintain slump above 160mm for increase his labour workability. I would like to know 160mm is a right slump for slab casting "or" this is not right than what kind of negetive results we can face in future regarding concrete. - Kapil Sharma -
|
View (Replies-1) |
Post reply |
| 27/02/2010 |
|
i kindly request for two question 1.compressive strength of concrete,2.heat resistance of concrete - seenivasan -
|
View (Replies-0) |
Post reply |